How it works

Three steps. No risk to your operations.

Everything starts from data you already export. Nothing is installed, nothing is connected to your control system, and nothing runs on its own.

1. Send topside channels

A few wells: choke pressure and temperature, choke opening, gas-lift rate, plus trip and choke logs.

2. We replay the wells

Tree pressure estimated and scored against your subsea gauge if you have one; slugs re-scored with lead time.

3. Run it alongside

The proposal beside the production screen. Your people decide.

Rules we keep

Read-only. Explained. A person decides.

Read-only

We read exports. We never write to a control system.

Exported

Files you already export. No live link until a pilot earns one.

Explained

Every estimate with its interval and its evidence. UNEXPLAINED when unsure.

A person decides

Outputs are advisories and proposals. A named person acts.

What we need from you

  • Topside channels per well
  • Well geometry, or a normal-operation window
  • Separator trip and choke logs
  • A flow-assurance engineer on your side

What to expect

  • Intervals and stated identifiability
  • No control, ever
  • Every figure labelled: measured, inferred, assumed
  • Results so far: simulation (t001) and a public real split
How it works · Tieback